Case study
Wyndham Hoi An Royal Beachfront Resort & Villas
Turnkey ELV design and construction based on Huawei GPON optical infrastructure, delivering superior broadband connectivity for the Wyndham Hoi An Royal Beachfront Resort & Villas project.
Project facts

Executive summary
Wyndham Hoi An Royal Beachfront Resort & Villas is one of the region's largest luxury complexes, requiring a robust and aesthetically integrated telecommunications infrastructure. We are proud to serve as the Design & Build contractor for the entire Extra-Low Voltage (ELV) system, utilizing industry-leading technology: Huawei GPON Optical Infrastructure: Moving away from traditional copper cabling, we implemented Huawei's Gigabit Passive Optical Network (GPON) technology. This solution optimizes the entire cabling system, saves installation space within the villas, and provides massive bandwidth, ensuring absolute Internet stability for guests. Turnkey Design & Build Services: We meticulously manage the entire project lifecycle—from solution consultancy and detailed technical design to direct on-site installation of the entire ELV system. This ensures perfect synchronization between the network infrastructure and all end-user devices. Full-spectrum IT Ecosystem: Delivering a complete range of services, including Network & Wi-Fi, Server & Storage, PABX systems, and modern interactive IPTV solutions, fully complying with Wyndham Group's stringent global operational standards. The synergy between advanced fiber-optic technology and our professional execution has established a solid technological foundation, elevating the 5-star resort experience at Wyndham Hoi An.
Project context
This project sits inside an environment where technical depth, delivery timing, and operational continuity have to align from day one.
How we delivered it
Reviewed scope, integration dependencies, and site priorities before deployment.
Coordinated multiple infrastructure disciplines so handover did not rely on fragmented packages.
Structured testing and delivery around the project phase and operational target date.
Delivery outcomes
Clearer implementation sequence across related systems.
Reduced coordination gaps between technical teams and operational stakeholders.
A more reliable handover foundation for long-term support.
Planning something similar?
Share the property type, opening timeline, and target systems. We will recommend the right scope, coordination plan, and delivery sequence.
Request consultationGallery
Selected project visuals




